Week 21: March 20 - 26


Week 21, the first picture above is of our dormer mock up. Not too much progress made at the moment, this week was a testing week so we were busy with other things. But we did make it as far as getting all the gable end studs up.


I wanted to talk a little bit about some of the different types of house wraps we're using. Featured above, from left to right, is HydroGap and Blueskin VP100. HydroGap has a built in drainage plane feature. This means that furring is technically unnecessary, as the amount of space required for water to shed behind any type of siding is already built in.
Blueskin is a self-adhering house wrap. It comes in 4", 6", 9", 12" and 48" roll width sizes, lengths of 100'. This product is interesting, because it allows application of the product without additional penetration of the building envelope (with fastners). It creates a completely air and water tight seal, although in the literature it does state that it is a vapor permeable barrier... It comes with a 12 month warranty, but only if the product is truly defective. 


Here I have one picture of all of the corner boards that have gone up on the sheds. I haven't had a personal hand in constructing these, but I was noting in the picture the notching that needed to happen up at the soffit, so that the corner board looks like a complete assembly. The corner boards are furred out 3/8 - 1/2", dependent on what type of siding will be used. The corner boards are kreg drilled and glued together, with the front facing board being the full width, and the side board (of the complete assembly) being it's width minus the thickness of the adjoining board.


And here, in the later part of the week, I was working on installing a window. Pictured above is the window RO (Rough Opening), with the correct window to be installed positioned below. I first cut the Typar House wrap out of the window opening, and cut the top at 45 degree angles away from the window opening, so that the flap could be lifted up and taped down over the window once it is installed.


Here I have a shingle cut to the RO width. This will aid in water drainage (in the correct direction: OUT), angling and trapped water out and away from the house. Water penetration is the biggest issue to combat when making any hole in the building envelope.


And here I have the window caulked and tacked in place (with galvanized roofing nails = no rust). Underneath the window, you can see the Grace Vycor Plus that I used to flash the window. When flashing, I cut 'bow ties', or angled strips that sealed the lower corners of the window RO first. Then a 34" strip was cut for the complete lower panel flashing. 24" for the RO, + 5" for each side. The extra on each side was run up the inside of the window RO. Slits were cut 3" deep in the roll and 5" in, allowing us to bend the Vycor down and over the window furring and housewrap.






Saturday, March 12, 2016

Week 20 March 6 - 12


Catching up here on some things from Week 19, painting the exterior trim of our 10 x 12 shed.



Here I am laying out the rafters on the top plate of our wall.


Cutting the rafter pattern with the miter saw so that we would have the straightest, truest cuts to trace onto all of the other rafters.


Finish cutting out the rafter tails with my handsaw.


Using my skill saw to notch out the end of the rafters, for the fascia to sit below the crown molding.


And finally, the beginning of week 20 here. The 10 x 12 shed is completely wrapped in Typar house wrap. I will post pictures of the other types of house wraps in the next weeks post.


Here I have bracing inside or our dormer mock up shed. This will make it easier for us to do sheathing and all of our exterior work, without having to worry about anything being in the way. We also used this bracing to shift the ridge so it would be plumb.


The LSL lumber we are using to frame the window openings.


Notch cutting for the gable end studs. 1 1/2" deep with a roughly 45 degree angle.


And finally the back wall of the shed with all of the gable stud framing in place! Happy Spring Break!



Week 19: February 28 - March 5


Week 19 I am laying out rafter tails in the design drawings above. These rafter tails vary away from the common rafters we have been practicing frequently, and even the hip and valley rafters we spent a considerable amount of time on. What we're trying to accomplish, with all of these different pieces shown, is a rafter tail that will support crown molding.


The 5/8" plywood on top (top referring to rafter orientation, the plywood is actually all the way to the left) is standing in as a mockup for the roof deck that would be on top of these rafters once assembled. The thin piece of a block that lies flat represents the crown molding. The thicker block that lies just below that represents the fascia.








The dormer mock up shed we're working on, This shed has an 11/12 pitch roof and will have a dormer framed on either side. In This picture we have the rafters and ridge board installed, as well as some bracing to keep the whole system from racking back and forth.


A picture of our rafter tails. I was getting a lot of questions in class as to why the tails looked so weird, but again, referring to the pictures above of the sheathing, crown molding and fascia system, this is the way that the system presents on the end of the rafter tail. The first almost 90 degree (to the rafter tail itself) run downward supports the crown molding. The v cut in the center (the lower portion) will support the fascia, while there will be sheathing above and below the rafter tails we will place the soffit.


Here I am using a bar clamp to pull this rafter back down, so it will be firmly seated on the plate. With it clamped in place, I was able to re screw the birds mouth in place.


Monday, February 29, 2016

Week 18: February 21-27


 

Week 18, I did a little work in and outside of the shed. Here I've put collar ties in place. These boards prevent the walls from spreading, which they are inclined to do, due to the downward/outward force of the rafters. You can see the angled cut, allowing the board to flush up with the outside edge of the top plate (framing).


The collar ties are spread 4 feet apart. Because the shed is only 12 feet long, only two collar ties are needed.
 

In this picture I've moved onto putting the drip edge back in place. Before taking it off (it was previously fitted in place), I numbered each part in the order it would be reassembled. Some work did need to be done to get the pieces fitted well together.
 

Here I am cutting shingles and starting the first course. Using a piece of plywood and a straightedge, I cut the first course of shingles (which are 3-tabs), removing the tabs. These were placed along the entirety of the first course, and then we placed architectural shingles over the starter course, flushing the architectural starter course with the 3-tab starter course.


Nailing the shingles in place, we were careful to offset our second course of shingles by 10", the third by 20", and the fourth by 30". This ensures that our nailing schedule never comes into conflict with any other nails. All nailing is 1" in from both sides, and then a third of a full course length in from each end, another nail is driven along the nailing line. (Each shingle tab has a visible chalk line, for nailing.)
 

Here I have five courses of shingles up.
 

Every couple of courses, we like to snap a chalk line. This ensures that we are still running courses that are true, not skewed, or running off course.
 



Here we are putting the ridge vent in place. First we snapped chalk lines, half the width of the ridge vent, down from the peak of the drip edge (where it meets at the ridge.), on both sides. This allows us to line up the ridge vent, along it's entire run.


And here we are nailing the vent in place, with galvanized nails.

Friday, February 19, 2016

Week 17: February 14-20


Week 17 is a short week, Monday was President's Day, so there was no school, which means no work. On Wednesday we came back and started putting up staging so the roof of our sheds would be more accessible.




After the staging was up, we swept off the deck thoroughly, measured up from the eaves 17 1/2" (the width of the Grace Ice and Water Shield, minus a 1/2" that extends down over the eaves. This aids in water run-off), and snapped a chalk line for referencing.


Here we are applying the Grace Ice and Water Shield. This is primarily for practice, as there is no practical application to putting material on a building with no true thermal envelope. Without heat, there is minimal risk of ice dam buildup. Heat is required to melt ice that would settle on the roof, allowing it to flow down to a lower, cooler point. There it would refreeze, having potential to cause major damage to the roof and underlying members (and insulation.).


Here we have felt underlayment down, getting ready to install our shingles. The nails are specially equipped with orange washers, which prevent the nails from being sunk to deeply, and more effectively pin the roof wrap in place.


And here in this last picture, you can see the felt overlapping the Grace Ice and Water Shield. Everything on the roof is worked from the eaves up, so as to make sure all materials overlap the previous lower material. This ensures that all water run off will be directed down and off the building in an efficient manner.









Week 16 February 7-13


Week 16 and I officially finished with my portion of the hip and valley mock-up. The hip rafter (left center) and the valley rafter (immediately to the right) were my area of focus. I started with the left side of the hip rafter, calculating the longest hip jack rafter and then moving down to the shortest hip jack. After those two were finished, I moved over to the right side, starting with the longest hip jack rafter on the bottom, and then moving onto the hip valley cripple. By working from the biggest member to the smallest, we were attempting to conserve material. If a mistake with a larger member was made, there would possibly be an opportunity to re-purpose it into a smaller member.


The line length of all rafter members are calculated using the run under the rafter, times the unit length. Achieving unit length is done by adding the rise squared times the common run squared (for a common rafter, e.g.: 8^2 + 12^2 = C^2), and finding the square root of the resulting number. For a hip or valley rafter, unit length is found in a similar fashion, only the run is determined as 16.97 in all mathematical calculations (17 on the framing square, due to the it's lack of precision.). The hip run is squared and added to the squared rise, as previously described.


After completing the hip/valley mock-up, I moved back to working on our shed. The soffits were completed, so we installed the facia over the rafter tails. There is a 1/4" reveal on the bottom.


Here is a close-up of the rake facia and eave facia meeting. We allowed the rake facia to run long until all parts were in place, and then the excess was sawed off with a handsaw. This had to be done carefully, so as to not scratch, or scuff the facia. It is finished trim work, which will have minimal touch-ups.


Here we are getting ready to assemble the returns internal pieces. The pencil mark above indicates where the extended piece of the return will be ripped to.


All four pieces kreg drilled, pocket screws and glue standing by...


A piece of the return in place.


An above image of the kreg drilled piece.


The left side




After most of the return pieces were assembled, we started work on the drip edge. The pieces are aligned and cut by hand, the rake edge comes down over the eave edge, to allow water to run off.


The drip edge pinned in place.